imgboxbg
General

Jin Ming Yu Shuhe Garden (West District) fire safety deeds materials

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2020-09-23 15:04
  • Views:

(Summary description)Shuhe Garden(West District)is located at the north end of Guangming North Road.The building area is 225,000 square meters and consists of 14 high-rise buildings.

Jin Ming Yu Shuhe Garden (West District) fire safety deeds materials

(Summary description)Shuhe Garden(West District)is located at the north end of Guangming North Road.The building area is 225,000 square meters and consists of 14 high-rise buildings.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2020-09-23 15:04
  • Views:
Information

  Shuhe Garden(West District)is located at the north end of Guangming North Road.The building area is 225,000 square meters and consists of 14 high-rise buildings.The community started construction in early 2013 and was delivered to use in 2016.It has 1,020 households and a population of approximately 3,000.
  Over the years,we have always insisted on strengthening internal management,putting safety in the first place and managing it as a normalization.Relying on scientific management and first-class service,internally focus on management,externally build an image,continue to deepen internal reforms,pay close attention to fire safety work,rely on quality for survival,rely on reputation for development,and establish a good reputation in the society with sincerity and reputation The corporate image promotes the continuous improvement of economic and social benefits.We mainly focus on fire safety work from the following aspects.
  1.Strengthen safety education for all employees
  Safety work is no small matter,adhere to the policy of"prevention first,combining prevention and elimination",and earnestly implement laws and regulations related to fire safety work.Carry out fire safety education among all employees,and instill fire safety work into the hearts of every employee.Strengthen fire safety knowledge training and require all employees to keep in mind the Group's"Fire Safety Management System"and master the fire safety operating procedures.In 2018,4 fire evacuation drills were organized,with more than 200 participants.
  2.Complete and perfect standard processes
  The following related systems have been formulated and improved:"Fire safety education and training system","Fire hazard rectification system","Safety facility management system","Fire and electricity management system","Fire protection inspection and inspection system","Fire fighting and Emergency Evacuation Plan Drill System,"Fire Control Room Duty System","Night Duty Management Regulations".Organize employees to learn the above system and sign on the learning system record form.
  3.Clear job responsibilities
  (1)Fire safety work should not be sloppy.The responsibility for fire safety work should be assigned to people,and responsibilities,rights and obligations should be clarified.Whoever goes wrong will be responsible,and whoever goes wrong will be held accountable.The person in charge of the position is determined to be the first person responsible for safe operation,with a clear division of responsibility and authority.
  (2)Signed a fire safety responsibility commitment letter.
  4.Regular safety inspections
  Fire safety focuses on prevention,so that prevention is possible before it happens.The safety measures are carefully implemented and supervision is strengthened.Strengthen daily fire safety inspections.And fill in the inspection records carefully.
  5.Do a good job in the maintenance of fire protection facilities and the management of key parts
  Do regular maintenance,maintenance and inspection of fire-fighting facilities to ensure the safe and effective operation of fire-fighting facilities.The key parts such as the decoration construction site are equipped with necessary fire extinguishing devices.Those involved in open flame operations are supervised by special personnel,and the construction site is regularly inspected on duty.The construction site should be kept tidy,and construction waste should be timely transferred and cleaned.The flammable and explosive items in the decoration and demolition process shall be operated by professionals and monitored.
  Six,focus on the safety management of electricity use
  (1)Line laying specifications,the selection of wires and plug-in strips comply with national quality standards,and the use of wires and sockets matches the load of electricity.It is strictly forbidden to use unqualified wires and sockets,excessive power consumption,excessive use of wires and sockets,private or random connection of lines,regular inspections of lines,and timely measures when abnormalities are found.
  (2)In the office area,the lights are off and the equipment is turned off.
  Seven.Implement fire safety assessment and quality inspection of building electrical fire protection facilities
  Conduct fire safety assessments and quality inspections of the installation of electrical fire protection facilities in buildings every year.
  8.Miniature fire station construction
  (1)In order to improve the management level and fire prevention capabilities,in strict accordance with relevant requirements and standards,we will make every effort to promote the construction of"mini fire stations".It clarified the staffing,fire-fighting equipment,job responsibilities and other tasks of the micro fire station,and formulated the work system for the management of the micro fire station team,fire prevention inspection,and on-duty linkage.
  (2)The person in charge of key fire safety sites shall be identified as the person responsible for the construction of the miniature fire station,and the construction of the miniature fire station shall be fully carried out in accordance with the standards of personnel,equipment,systems,inspections,drills,rewards and punishments.
  (3)Miniature fire station fire equipment configuration:12 bottles of dry powder fire extinguisher,2 protective helmets,2 protective clothing,2 pairs of protective gloves,2 protective pants,2 pairs of protective boots,2 fire axes,2 fire wrenches,4 boxes of gas masks,4 walkie-talkies,2 bright flashlights.
  Linshu County Jinming Yushu River Garden(West District)
  2019.2.11

Scan the QR code to read on your phone

Related News

Jin Ming Yu Construction Group has taken several measures at once Promote the project fine management to go deep and solid
In order to further promote the company's project fine management to go deep and solid, Jinming Yu Construction Group continues to explore excellent management programs,
more 白箭头 黑箭头
Linshu County, major accidents in the field of housing
On June 24, Linshu County's 2024 Action and Safety Production Month emergency drill activities were successfully held in……
more 白箭头 黑箭头
Good "start the first lesson" to return to work safety
In order to do a solid job of production safety after the holiday, ensure that all work starts well and starts well.
more 白箭头 黑箭头
Previous page
1
2
15

For five consecutive years, the county's enterprise tax ranking has been in the top three, has won the "construction backbone enterprise", "provincial contract and trustworthy enterprise", "provincial prefab building demonstration base" and other honorary titles.

CONTACT US

Tel:+86-0539-6263677

Address: West End of Zhengda Street, Linshu County, Linyi City, Shandong Province

jinmingyu

Official account

jinmingyu

Visit the Website

Copyright ©Jinming yu construction group co., LTD.,   All Rights Reserved     鲁ICP备14020145号-3    300.cn