imgboxbg
General

Two construction methods were awarded "Municipal Engineering Construction Method"

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2024-06-26 17:36
  • Views:

(Summary description)On May 23, the Linyi Housing and Urban-Rural Construction Bureau announced the list of ……

Two construction methods were awarded "Municipal Engineering Construction Method"

(Summary description)On May 23, the Linyi Housing and Urban-Rural Construction Bureau announced the list of ……

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2024-06-26 17:36
  • Views:
Information

On May 23, the Linyi Housing and Urban-Rural Construction Bureau announced the list of construction methods of Linyi City in 2024. Jinming Yu Construction Group's "After pouring belt waterproof stubble protection construction Method" and "Concrete construction pump pipe cleaning sewage collection Method" were awarded the 2024 "Linyi City Project Construction Method".
The key point of construction of "After pouring belt waterproof stubble protection Construction Method" is the protection of waterproof stubble after pouring belt to avoid long-term exposure of waterproof materials at the after pouring belt, which can not be effectively combined to cause leakage.
The specific practice is that after the completion of the waterproof material placement, the edge of the post-pouring belt is isolated by wooden square before the protective layer is poured, the part other than the protective layer is covered by a film, and the protective layer of fine stone concrete with a thickness of 30-40mm or mortar is poured for protection. Compared with the traditional coil directly covered material for protection, the construction method first uses film cover, and then pours concrete for protection, on the one hand is not easy to cause disturbance leading to the destruction of the coil, on the other hand, it can be cleaned by hammering, convenient construction.
The "Concrete construction pump pipe cleaning sewage collection method" is to wash the concrete pump pipe water through the floor drainage pipe into the sedimentation tank, the sedimentation tank water directly through the drainage pipe into the sewage collection tank, the sewage collection tank water again through the pump to the car pump to wash the concrete pump pipe, through recycling can save a lot of water resources. The construction method does not cause pollution to protective measures such as external wall concrete and external frame mesh, and meets the requirements of civilized construction. The collection and reuse of cleaning pump water is conducive to saving water resources and is in line with the development concept of energy saving and environmental protection.
Construction method is an important content of the development and application of new technology, and it is also an important symbol of the technical level and construction ability of enterprises. In recent years, Jinming Yu Construction Group combined with the characteristics of various projects, actively encourage each project to summarize mature advanced technology, declare municipal construction method, and strive to improve the level and influence of engineering technology management. The acquisition of 2 construction methods marks a new breakthrough in technological innovation of Jinming Yu Construction Group, which further promotes the high-quality sustainable development of the enterprise.
In the next step, Jinming Yu Construction Group will continue to maintain the spirit of exploration and innovation, uphold the concept of innovation-driven development, and strengthen the transformation of scientific and technological achievements and the application of new technologies; Increase investment in science and technology research and development, actively explore and overcome a series of technical problems, for the development of the industry has brought more innovative results.

Scan the QR code to read on your phone

Related News

Jin Ming Yu Construction Group has taken several measures at once Promote the project fine management to go deep and solid
In order to further promote the company's project fine management to go deep and solid, Jinming Yu Construction Group continues to explore excellent management programs,
more 白箭头 黑箭头
Linshu County, major accidents in the field of housing
On June 24, Linshu County's 2024 Action and Safety Production Month emergency drill activities were successfully held in……
more 白箭头 黑箭头
Good "start the first lesson" to return to work safety
In order to do a solid job of production safety after the holiday, ensure that all work starts well and starts well.
more 白箭头 黑箭头
Previous page
1
2
15

For five consecutive years, the county's enterprise tax ranking has been in the top three, has won the "construction backbone enterprise", "provincial contract and trustworthy enterprise", "provincial prefab building demonstration base" and other honorary titles.

CONTACT US

Tel:+86-0539-6263677

Address: West End of Zhengda Street, Linshu County, Linyi City, Shandong Province

jinmingyu

Official account

jinmingyu

Visit the Website

Copyright ©Jinming yu construction group co., LTD.,   All Rights Reserved     鲁ICP备14020145号-3    300.cn